ORBITAL DATA CENTRES / PHYSICS / EVIDENCE / SOVEREIGNTY
One question.
One focused page.
Evidence-aware explainers designed to stand on their own: clear definitions, complete engineering boundaries and explicit statements of what Proof of Pulse has—and has not—demonstrated.
Build category authority
through useful answers.
What is an orbital data centre?
A complete architecture definition covering payload compute, power, thermal rejection, radiation, communications, autonomy, ground operations and end-of-life.
READ EXPLAINER → ECONOMICS METHOD · 12 SEP 2026How should orbital and terrestrial data-centre costs be compared?
A common-workload, complete-lifecycle framework that prevents launch, cooling, reliability, replacement or financing costs from disappearing outside the comparison.
READ METHOD → SOVEREIGN ARCHITECTURE · 12 SEP 2026What makes orbital compute sovereign?
A practical control model for data origin, processing authority, encryption keys, jurisdiction, provenance, auditability and cross-border operations.
READ ARCHITECTURE →Follow the constraints
from heat to evidence.
Each page isolates one system question, states the current Proof of Pulse maturity, and identifies the test that would convert a research position into stronger evidence.
How do orbital data centres reject heat?
Why vacuum removes convection, how heat moves to radiators, and which thermal-vacuum evidence is required.
READ THERMAL METHOD → RADIATION AWARENESS · 12 SEP 2026How can orbital compute tolerate radiation?
A system approach spanning mission dose, parts, shielding, memory integrity, fault containment and recovery.
READ RADIATION METHOD → HOSTED PAYLOADS · 12 SEP 2026What is a hosted-payload orbital data centre?
The host–payload boundary, non-interference duties, shared infrastructure and honest economics perimeter.
READ ARCHITECTURE → COMMUNICATIONS · 12 SEP 2026How do orbital data centres move data?
Radio, optical links, ground gateways, store-and-forward operations, link budgets and security boundaries.
READ NETWORK METHOD → WORKLOAD SELECTION · 12 SEP 2026Which computing workloads belong in orbit?
A workload-first scorecard for data origin, latency, duty cycle, control, failure recovery and hardware refresh.
READ DECISION FRAMEWORK → RESEARCH METHOD 01 · 12 SEP 2026What makes an orbital compute claim credible?
The public release protocol for measured results, models, supplier specifications, targets and corrections.
READ EVIDENCE STANDARD →First-party research, visibly labelled.
These articles explain the Proof of Pulse research position. They are not independent journalism or peer review. Each article separates generally accepted engineering constraints, Proof of Pulse design choices, modelled targets and evidence still required. Protected implementation detail remains outside the public layer.
Start with the knowledge hub.
Read the concise definitions and evidence boundaries most often needed by investors, researchers and AI systems.
Read the release method, then move into the public research and validation map.
Evidence standard →Inspect research ↗